Part Number: DRA821U
Hi
Is the internal Pullup/Pulldown enabled in SBL (Secondary Boot Loader)?
Is there an intermediate potential and through current between device power-up and internal pullup/pulldown enabled (until SBL processing is complete)?
Does this damage the device?
Thanks and Best regards,
Tsurumoto.