1.BAM traffic shaping at switch side.
2.As per the TI suggested document followed for the test. but , limit the traffic in the host port so that BAM traffic toward NAD is low
software-dl.ti.com/.../CPSW-CBS.html
3.Configured the switch in BAM side and configured the vlans in PC.
4.We have verified the scenario with following document provided by the TI mentioned above, as we can see in the results, we are not able to achieve the expected results.
5.Can you please let us know the why we are not able to achieve the expected results ?.
6.Please find the tested scenarios in the below attachments.
Tested steps: -