TDA4VH-Q1: Power sequence delay between rails

Part Number: TDA4VH-Q1
Other Parts Discussed in Thread: TDA4VH

Tool/software:

The power sequence foot marked time delay, but it is between ramp up start point, did not mark delay requirement after reaching required stable level. is there such delay requirement?

If the previous rail start ramp up first, but ramp up slowly, reach stable level same as later rail, or <1ms, is it acceptable for TDA4VH?