Part Number: AM6412
I have a question about the AM6412 startup sequence.
I looked at the sequence diagram (Figure 6-5. Power-Up Sequencing) on page 117 of the AM64x datasheet (SPRSP56H – JANUARY 2021 – REVISED DECEMBER 2025).
Waveform <C> starts after Waveform <B>.
What is the minimum time difference in ms required between Waveform <B> and Waveform <C>?
Also, is simultaneous startup acceptable?
