CDCE62005 vs CDCE72010

Other Parts Discussed in Thread: CDCE62005, CDCE72010

The C6678 EVB uses 2x CDCE62005 which has 5 differential output clocks each. I am intending to use 1x CDCE72010 which has 10 output clocks.

However, the CDCE62005 and CDCE72010 seems a bit different. CDCE72010 is a Ten Output High Performance Clock Synchronizer, Jitter Cleaner and Clock Distributor whereas CDCE62005 is a Five/Ten Output Clock Generator/ Jitter Cleaner With Integrated Dual VCOs.

Could I replace 2x CDCE62005 with 1x  CDCE72010 just like that. My concern is that I may lose some functionality if I switch from CDCE62005 to CDCE72010 (such as the Integrate VCO in CDCE62005 which is not mentioned in CDCE72010).

  • The two CDCE62005 clock generators are currently used to generate six possible clock inputs to the C6678.  There are a number of issues to consider if you were switching to the  CDCE72010 and I can't say whether it would work for you application without additional details on what you're trying to accomplish.  It's clear that you would have to add an external VCXO and it's appropriate circuitry to use the CDCE72010 and calculate whether all the frequencies you need could be divided down from a single synthesized frequency.  This couldn't be accomplished for the EVM but that depended, in large part, on the frequencies that we selected for some of the clock inputs.  Remember that we are trying to create an evaluation board that is as flexible as possible and that adds some complexity that you might not need.  For example, both the CORE_CLK and the PA_SS_CLK have 100MHz clock sources, the CORE_CLK from the first CECE62005 and the PA_SS_CLK is from the second.  This was done to provide the possibility of a different clock frequencies for these two inputs but in a real application if both inputs needed 100MHz the PACLKSEL pins could be pulled low allowing the CORE_CLK input to be used by the PA PLL and eliminating the need for a clock on the PA_SS_CLK input. 

    What are the clock requirements for you application board?  Are you using all of the SERDES interfaces?  Can you use the same generated clock for the serdes clock inputs by using a clock distribution as opposed to generating each individually?  All these questions need to be answered before determining you clock generator needs.