Hi,
Could you tell me about TPS61026 shutdown sequence.
In the ON / OFF test of the customer, Vout and VBAT become 0V before EN, LBI pins.
EN and LBI pins are kept at about 1V for 2 sec.
Is there a risk of failure if this off sequence?
Best Regards,
Yusuke