LMK03328: re-programming during operation

Part Number: LMK03328

Hi 

Does the LMK03328 support upgrading/reprogramming the device during operation without affecting the clock output while programming?

Our LMK is feeding the FPGA, and the FPGA is responsible for programming the LMK. Can the LMK be reprogrammed while maintaining uninterrupted clock output?

  • Hi Eran,

    The output clocks of the LMK03328 will not be affected by re-programming the device registers unless the registers being updated are related to the output characteristics (i.e. frequency, format, etc). Updating anything PLL related requires the VCO to be calibrated, and during a calibration routine, the device mutes output channels configured with the respective auto-mute control enabled so the channels do not generate spurious clock signals.

    However, if you're doing something like muting channel 5 for example, all other outputs will not be affected by this re-programming aside from potential crosstalk effects. 

    Best,
    Jaryd