Hello,
I have a question about XIO2001 power sequence, especially /PERST deassertion timing.
1.
The datasheet says to wait a minimum of 100ms after applying power in the below figure (Yellow marked line)
I think this “after applying power” mean “after all 1.5V, 3.3V and PCIR power rails are stable within recommended operating condition”.
Is this my understanding correct?
2.
Although above datasheet description says “after applying power”, following figure 4 shows that /PERST is deasserted 100ms after /GRST.
Which is correct, “100msec after all power rails stable” or “100msec after /GRST deasserted”?
I know /GRST must be deasserted after all power rails stable.
So my question means that does the /PERST deassertion have to wait 100m after /GRST deassertion if all power rails are stable much before?
Regards,
Oba