This thread has been locked.

If you have a related question, please click the "Ask a related question" button in the top right corner. The newly created question will be automatically linked to this question.

BQ34Z651: Production Programming Verification

Part Number: BQ34Z651

Hi team,

We have a question from a customer using the bq34z651 and a .senc file. 

They need to guarantee that the correct version of .senc file is programmed (with their customer parameters modified and rev controlled by our Engineering team) and that programming was 100% accurate using an automated method. They’ve looked into the Data Flash signature command but the values appear to be dynamic.

 What is the best method for ensuring programming was completely successful? Is there a way/best practice for generating a checksum?

Thanks,
Jacob