RM4x Silicon Revision

RM4x Hercules Users,

 

There will be silicon revisions to the RM4x Hercules product line to fix several critical issues.

  • RM48 Rev C -> Rev D
  • RM46 Rev B -> Rev C
  • RM42 Rev A -> Rev B

 

The Part Change Notification (PCN) will be sent the end of June, 2015.  More detailed information on the change will be available at that time.

 

This post will provide the following information for RM4x products.

  1. Which errata will be fixed in which product family.
  2. Schedule summary
  3. Impact of the fix.

 

Which errata will be fixed

The errata that will be fixed are listed in the first column of the table below.  There is a column for each RM4x device family.  Meaning of “Fixed” is obvious.  N/A means the errata does not apply to that device family.  Errata that are listed in the errata sheet and not listed in this table will not be fixed.

 

Errata

RM48

RM46

RM42

Power-on reset during bank 7 Sector erase may corrupt other sectors

(erratum DEVICE#B041)

N/A

N/A

Fixed

Reads of Bank7 may be corrupted by short glitches on nPORST pin

(erratum DEVICE#B042)

N/A

N/A

Fixed

Incorrect Write to External Memory using Store-Multiple CPU instruction

(erratum DEVICE#B064)

Fixed

Fixed

N/A

CPU write to peripheral or EMIF may be lost

(erratum DEVICE#B071)

Fixed

Fixed

N/A

PBIST ROM Algorithm Doesn’t Execute

(erratum PBIST#4)

Fixed

Fixed

Fixed

Change to PLL Lock Time

(erratum SWF021#44)

Fixed

Fixed

Fixed

 

Schedule Summary

The following table summarizes the schedule for the RM4x product family.  Samples will be available as part of the PCN process.  Superset configurations of the device family will be available first followed by all P/Ns. 

 

Milestone

RM48

RM46

RM42

Development Samples

Now (TMS Rev C)

Now (TMS Rev B)

Now (TMS Rev A)

TMS release

Jun/15 (Rev D)

Jun/15 (Rev C)

Jun/15 (Rev B)

Production Samples

(<200units of superset P/Ns)

Jun/15 (Rev D)

SuperSet: RM48L952

Jun/15 (Rev C)

SuperSet: RM46L852

Jun/15 (Rev B)

SuperSet: RM42L432

Production Samples (All P/Ns)

Sep/15 (Rev D)

Sep/15 (Rev C)

Sep/15 (Rev B)

Production Volume Shipments

Nov/15 (Rev D)

Nov/2015 (Rev C)

Nov/15 (Rev B)

 

The status of the safety certifications of the current revisions of the RMxx production qualified devices are:

 

  • RM48x rev C --> assessment complete; certification expected shortly
  • RM46x rev B --> certified as of 11/2014
  • RM42x rev A --> assessment starts this week, estimated early 3Q15 completion

 

The device revisions are planned to go through functional safety assessment in 2015, following certifications of the current silicon revisions.

 

  • RM48x rev D --> estimated 4Q15 completion
  • RM46x rev C --> estimated 3Q15 completion
  • RM42x rev B --> estimated 4Q15 completion

 

Impact of the fix

The following table suggests what changes may be required for the new revisions. 

 

Errata

Change required for new revisions

Power-on reset during bank 7 Sector erase may corrupt other sectors

(erratum DEVICE#B041)

May leave workaround in place, no change to SW required

Reads of Bank7 may be corrupted by short glitches on nPORST pin

(erratum DEVICE#B042)

May leave workaround in place, no change to SW required

Incorrect Write to External Memory using Store-Multiple CPU instruction

(erratum DEVICE#B064)

May leave workaround in place, no change to SW required

Change can be made to re-gain EMIF performance

CPU write to peripheral or EMIF may be lost

(erratum DEVICE#B071)

May leave workaround in place, no change to SW required

PBIST ROM Algorithm Doesn’t Execute

(erratum PBIST#4)

May leave workaround in place, no change to SW required

Change to PLL Lock Time

(erratum SWF021#44)

Evaluate impact of additional 384 OSCIN cycles

 

TI does not anticipate the changes made in revised devices to impact estimated safety metrics in the device safety analysis reports nor recommendations made in device safety manuals. The customer is responsible for evaluating all functional safety related impact, if any, of these changes to the implemented system and to take appropriate actions to mitigate any perceived impact to system level functional safety.

 

Regards,

Dave

 

  • RM4x Hercules Users,  

    There has been a delay in schedule. 

    There will be silicon revisions to the RM4x Hercules product line to fix several critical issues.

    •             RM48 Rev C -> Rev D

    •             RM46 Rev B -> Rev C

    •             RM42 Rev A -> Rev B 

    The Part Change Notification (PCN) will be sent the end of July, 2015.  More detailed information on the change will be available at that time. 

    Schedule Summary

    The following table summarizes the schedule for the RM4x product family.  Samples will be available as part of the PCN process.  Superset configurations of the device family will be available first followed by all P/Ns.  

    Milestone

    RM48

    RM46

    RM42

    Development Samples

    Now (TMS Rev C)

    Now (TMS Rev B)

    Now (TMS Rev A)

    TMS release

    Jul/15 (Rev D)

    Jul/15 (Rev C)

    Aug/15 (Rev B)

    Production Samples

    (<200units of superset P/Ns)

    Jul/15 (Rev D)

    SuperSet: RM48L952

    Jul/15 (Rev C)

    SuperSet: RM46L852

    Aug/15 (Rev B)

    SuperSet: RM42L432

    Production Samples (All P/Ns)

    Oct/15 (Rev D)

    Oct/15 (Rev C)

    Nov/15 (Rev B)

    Production Volume Shipments

    Dec/15 (Rev D)

    Dec/2015 (Rev C)

    Jan/15 (Rev B)

     The status of the safety certifications of the current revisions of the RMxx production qualified devices are: 

    • RM48x rev C --> assessment complete; certification expected shortly
    • RM46x rev B --> certified as of 11/2014
    • RM42x rev A --> estimated early 3Q15 completion 

    The device revisions are planned to go through functional safety assessment in 2015, following certifications of the current silicon revisions. 

    • RM48x rev D --> estimated 4Q15 completion
    • RM46x rev C --> estimated 3Q15 completion
    • RM42x rev B --> estimated 1Q16 completion

     Regards,

    Dave

     

  • Thanks for the updated Dave.